Where Arc Meets Angle — Precision Metal
Fabrication, Built to Spec.
TIG-welded stainless frames, MIG'd structural steel, and plasma-cut aluminum panels. Held to ±0.005″ tolerances. Shipping from our floor six days a week.
Six Processes. One Floor.
From the first plasma cut to the final bead, every operation happens in-house. No subcontracting. No surprises on the punchlist.
TIG Welding
Precision GTAW on stainless, aluminum, and chrome-moly. Ideal for handrails, pressure vessels, and food-grade equipment requiring clean, spatter-free beads.
MIG Welding
High-deposition GMAW for structural steel, angle iron, and heavy-wall tubing. Multi-pass capability up to 2-inch plate with full-penetration joints.
Plasma Cutting
CNC plasma table with 60 × 120-inch capacity. Nested DXF files cut to ±0.030″ with clean dross-free edges on mild steel, stainless, and aluminum.
Structural Fab
Full-service structural weldment packages — base plates, moment frames, stair stringers, and custom brackets. IBC-compliant documentation available.
Ornamental Iron
Custom picket railings, cable rail systems, and decorative panels. Powder-coat or hot-dip galvanize finish options. IBC handrail compliance standard.
Industrial Piping
Schedule 40 / 80 carbon and stainless pipe fabrication for process, HVAC, and utility systems. Spool drawings, isometric cut-sheets, and pressure testing available.
The Credential
Behind the Bead.
Every weld procedure, every inspector qualification, every QMS audit — documented and available for your submittal package. We hand over the paper trail as confidently as we hand over the part.
Structural Welding — Steel
American Welding Society structural welding code. All production welders hold current CWI or CWB certification. Procedure qualifications on file.
Structural Welding — Stainless
Full compliance for stainless steel weldments including food-grade and pharmaceutical applications. Passivation documentation available.
Construction Safety Standard
All field installation crews hold current OSHA 10-hour cards. Shop floor safety program reviewed annually by third-party consultant.
Quality Management System
Documented QMS covering material traceability, in-process inspection, and final dimensional verification. NCR tracking with 30-day closure requirement.
Building Code Compliance
Handrail and guardrail fabrication engineered to IBC Section 1015 and IRC R312 requirements. PE-stamped shop drawings on request.
Steel Construction Manual
Fabrication practices aligned with AISC 360 specification. Connection design coordination with structural engineers via standard submittal workflow.
Need the full documentation package?
WPS / PQR records, welder qualification certs, and QMS summary — available as a single PDF.
The Iron We Run.
Every Day.
No outsourced operations. 22 pieces of production equipment maintained on a PM schedule — so your job doesn't wait for a vendor.
CNC Plasma Table
Hypertherm XPR300 — 60×120″True-hole technology for bolt-ready holes without secondary drilling. Automatic height control maintains kerf width through full sheet.

TIG Welding Stations
Miller Dynasty 280 — ×6 UnitsAC/DC capability for aluminum and stainless. Pulsed TIG for thin-gauge work. Dedicated purge fixtures for tube and pipe back-purging.
MIG Welding Stations
Lincoln Power MIG 350MP — ×8Flux-core and solid wire capability. Tandem MIG available for high-deposition structural passes. Automated wire feed for consistent bead profile.

CNC Press Brake
Amada HG-1303 — 130T × 10′Angle encoder feedback holds ±0.001″ repeatability. Offline programming via AMNC 3i. Tooling library covers 0.5mm to 12mm material range.

Overhead Bridge Crane
CM Lodestar — 5-TonFull bay coverage for positioning large weldment assemblies. Allows single-setup fabrication of frames up to 8 × 20 feet without repositioning.
Surface Grinder / Finishing
Blanchard 18AD-20 + Belt LineRotary surface grinder for base plates and precision mating surfaces. Belt sanding line for weld dressing and cosmetic stainless finishing.
Proof Before
the Story.
Each card leads with the number that mattered most — deadline met, tolerance held, citations avoided. Tap any card to read the full brief.
Meridian Construction Group
Stair Stringer Package — 8-Story Mixed Use
Stair Stringer Package — 8-Story Mixed Use
GC needed 40 custom stair stringers for an 8-story concrete pour sequence. Structural drawings delivered 9 days before pour date.
Parallel plasma cut and weld workflow across three cells. 40 stringers fabricated, primed, and delivered in 6 calendar days.
Pour sequence met. Zero change orders on fitment. GC added Forge to approved vendor list for all future structural packages.
Cascade Fluid Systems
Hydraulic Manifold Weldment — Prototype Series
Hydraulic Manifold Weldment — Prototype Series
Mechanical engineer required a 316L stainless hydraulic manifold held to ±0.005″ on all mating faces. First article needed in 10 working days.
TIG welded with stress-relief cycle between passes. Final grinding and CMM verification on all critical datums.
First article passed CMM at ±0.004″. Production order for 12 units placed within two weeks. Ongoing prototype relationship.
Pacific Northwest Dairy — Tillamook, OR
Corroded Utility Pipe Replacement — Food Grade
Corroded Utility Pipe Replacement — Food Grade
Facility manager flagged 220 linear feet of corroded carbon steel utility pipe three days before a scheduled OSHA inspection.
Emergency mobilization. Pre-fabricated 304 SS spool pieces cut, welded, and hydro-tested overnight. Field crew installed on Day 2.
System restored 18 hours before inspection. Zero citations. Facility awarded Forge a blanket PO for all future pipe maintenance.
Harbor Point Condominiums
Exterior Cable Rail System — 14 Floors
Exterior Cable Rail System — 14 Floors
Architect specified horizontal cable rail with custom steel posts for a 14-floor residential tower. IBC 200-lb point-load compliance required.
Designed and fabricated 180 custom powder-coated posts with swaged cable terminations. PE-stamped shop drawings submitted for permit.
312 linear feet installed in 4 days. Passed city inspection first submission. Featured in developer marketing materials.
Ready to Weld.
Are You?
Send us your project type, material, and drawings — we'll return a detailed quote within 24 hours. Standard turnaround is 72 hours from approved drawing. Rush available.
Download Our Capability Statement
4-page PDF covering processes, certifications, tolerances, and past project scope. Ideal for spec submittal packages.
Shop Information
From approved drawing to shipped assembly. Rush available for deadline-critical projects — call the shop directly to discuss.